← Business Studies
Operations management · 33 left
Quick drill · instant marking
Try it free — the AI marks 3 answers a day. A free account marks 30 a day. Sign up free →
TRW assembles bicycles in a factory. It keeps six months of frames, wheels and tyres in a large rented warehouse, and some parts rust before they are used. Workers walk a long way between the parts store and the assembly benches, and about 8% of finished bicycles have to be reworked because of faults.
Explain two methods of lean production TRW could use. Method 1: Explanation: Method 2: Explanation:
[6 marks]
Marked point by point against the mark scheme.
Modelled on Cambridge 0450 · Oct/Nov 2025 · Paper 13 · Q1(d)